T
TIER Analysis to determine if site met TIER II Requirements
Review existing MEP single line.
Generator Sizing Review/Analysis
Review Design Intent / Basis of Design Criteria / Initial Capacity Intent
Review of Structural design, Facility placement, and proximity threat assessment.
Temperature and Humidity Controls review and analysis
Capacity Availability Analysis and Telecommunication Infrastructure Review
Implementation of DCIM overlay for real-time utilization metrics.
Carrier Services coordination
Fuel Systems Study
ASHRAE Guideline cost impact assessment
Script writing on oversight of the commissioning process through Level 5 IST.
|